Blocktrain schedule will be filled by the system/dispatchers with both Loaded and Empty Containers
FROs are sent to the vendor indicating when “we” would like the containers to be railed
After each departure, the vendor sends us a departure list confirming which containers/FROs have gone on the train
We crosscheck our FRO list and the vendor’s in order to adjust any discrepancies
Once the FROs on the schedule are correct (some removed and some added), we distribute the unutilised costs on ALL (Empty and Full) the FROs that departed
Once the cost distribution is complete, the system will remove the FSD block and create the FSD per FRO
Hi ,
We have discussed the requirement with the FPO's.The requirement is not in line with the agreed global process .
attached mail
Hope we can close this as solved
Distribution of the cost is automated across the FRO both for laden and Empty repositioning orders
Block train global process as below
Blocktrain schedule will be filled by the system/dispatchers with both Loaded and Empty Containers
FROs are sent to the vendor indicating when “we” would like the containers to be railed
After each departure, the vendor sends us a departure list confirming which containers/FROs have gone on the train
We crosscheck our FRO list and the vendor’s in order to adjust any discrepancies
Once the FROs on the schedule are correct (some removed and some added), we distribute the unutilised costs on ALL (Empty and Full) the FROs that departed
Once the cost distribution is complete, the system will remove the FSD block and create the FSD per FRO
Good afternoon,
as required by Krishna please note in details italy requirements :
Our idea is to create new Cost assignment for BLT as below:
Fix Empty cost
Fix Full cost
1 fro rail 1 fro road for any Container unit as it is now
fro ship on board list via supplier portal by vendor therefore assigned to correct schedule by sap in automated way
Unused block train cost should be automatically added to FULL FRO
Avoid assign and cost distribution task in sap tm
Based on actual volumes 6 trains (64 teus at train) estimated impact
EXECUTION Manual rework (assign correct schedule + perform cost and distribution) estimated with 3 min/ Wo
+
SD 3 min/fro Manual rework due to charges not aligned with rates
IMPACT
64 TEUS X 6 TRAINS
TOT TEUR
384
3 MIN EXE + 3 MIN SD
TOT MIN
2304
TOT HOURS
38.4
TOT HOUR X TRAIN
6.4
TOT FTE X TRAIN
0.16
160.00
in attached file example how should work and impact
thanks to prioritize this request
Angela Gabriele Giacomo
minuta blt call